The ejector creates a vacuum in the system by virtue of water under pressure passing through its venture and opening the check valve. This spring opposed the check valve prevent water entering the vacuum gas pipe work on shut down of the system. The gas entering the ejector under vacuum via the check valve is vigorously mixed with the incoming water flow prior to injection in to the water to be treated.

Capacity 0.5 Kg/Hr to 10 Kg/Hr
Maximum back pressure 10 LBS
Water inlet connection 1” PVC Union
Solution out let connection 1” PVC Union
Vacuum gas connection 15mm PVC union